Bill of Quantities (BOQ)

This Bill of Quantities (BOQ) template is used in the tendering process to provide a detailed breakdown of the costs associated with a construction project. It helps contractors submit accurate bids and provides clients with transparency on project expenses.

Updated 15d ago
BOQBill of QuantitiesTenderConstructionQuotationProcurementCosts

{{company_name}}

{{company_address}}

Phone: {{phone}} | Email: {{email}} | Web: {{website}}

Bill of Quantities (BOQ)

Bill of Quantities (BOQ)

{{company_name}}

{{company_address}}

Phone: {{phone}}

Email: {{email}}

Website: {{website}}

BILL OF QUANTITIES (BOQ)

Project Title: {{project_title}}

Project Location: {{project_location}}

Client Name: {{client_name}}

Date: {{date}}

Instructions to Tenderers

1. All Tenderers must complete all sections of this Bill of Quantities. Any item left blank will be deemed to have a nil price.

2. Rates and prices must be submitted in {{currency_code}} (e.g., ZAR, NGN, KES).

3. The quantities given are estimated and may vary. Payment will be made on the basis of actual work executed and measured.

4. Tenderers are advised to visit the site and satisfy themselves of the nature of the work and conditions relevant to the project.

5. All prices quoted must be inclusive of all taxes, duties, and levies applicable in {{country_name}}.

Summary of Bill of Quantities

This section provides a summary of the total cost for each major section of the works. The detailed breakdown is provided in the subsequent sections.

| Item No. | Description | Amount ({{currency_code}}) |

|----------|-------------|----------------------------|

| 1.0 | Preliminaries | {{preliminaries_amount}} |

| 2.0 | Site Works | {{site_works_amount}} |

| 3.0 | Substructure | {{substructure_amount}} |

| 4.0 | Superstructure | {{superstructure_amount}} |

| 5.0 | Roof Works | {{roof_works_amount}} |

| 6.0 | Finishes | {{finishes_amount}} |

| 7.0 | Services | {{services_amount}} |

| | **Sub-Total** | **{{subtotal_amount}}** |

| | Contingencies ({{contingency_percentage}}%) | {{contingency_amount}} |

| | Value Added Tax (VAT) ({{vat_percentage}}%) | {{vat_amount}} |

| | **TOTAL PROJECT COST** | **{{total_project_cost_amount}}** |

Section 1.0: Preliminaries

This section covers general costs associated with the project that are not directly related to specific works items.

| Item | Description | Unit | Quantity | Unit Rate ({{currency_code}}) | Amount ({{currency_code}}) |

|------|-------------|------|----------|--------------------------|--------------------------|

| 1.1 | Mobilization and Demobilization | L.S. | 1 | {{mobilization_rate}} | {{mobilization_amount}} |

| 1.2 | Site Office and Facilities | Mon | {{site_office_duration}} | {{site_office_rate}} | {{site_office_amount}} |

| 1.3 | Insurances (Contractor All Risks) | L.S. | 1 | {{insurance_rate}} | {{insurance_amount}} |

| 1.4 | Site Security | Mon | {{security_duration}} | {{security_rate}} | {{security_amount}} |

| 1.5 | Health and Safety Measures | L.S. | 1 | {{hsc_rate}} | {{hsc_amount}} |

| | **Total for Preliminaries** | | | | **{{preliminaries_total}}** |

Section 2.0: Site Works

This section details the costs for works carried out on the project site before and during the main construction.

| Item | Description | Unit | Quantity | Unit Rate ({{currency_code}}) | Amount ({{currency_code}}) |

|------|-------------|------|----------|--------------------------|--------------------------|

| 2.1 | Site Clearance | SqM | {{site_clearance_sqm}} | {{site_clearance_rate}} | {{site_clearance_amount}} |

| 2.2 | Excavation to Reduce Levels | Cum | {{excavation_cum}} | {{excavation_rate}} | {{excavation_amount}} |

| 2.3 | Disposal of Excavated Material | Cum | {{disposal_cum}} | {{disposal_rate}} | {{disposal_amount}} |

| 2.4 | Hardcore Filling | Cum | {{hardcore_cum}} | {{hardcore_rate}} | {{hardcore_amount}} |

| | **Total for Site Works** | | | | **{{site_works_total}}** |

Section 3.0: Substructure

This section outlines the costs for works related to the foundation and ground floor slab.

| Item | Description | Unit | Quantity | Unit Rate ({{currency_code}}) | Amount ({{currency_code}}) |

|------|-------------|------|----------|--------------------------|--------------------------|

| 3.1 | Concrete Blinding (50mm thick) | SqM | {{blinding_sqm}} | {{blinding_rate}} | {{blinding_amount}} |

| 3.2 | Reinforced Concrete Footings | Cum | {{footings_cum}} | {{footings_rate}} | {{footings_amount}} |

| 3.3 | Blockwork Foundation Walls | SqM | {{foundation_walls_sqm}} | {{foundation_walls_rate}} | {{foundation_walls_amount}} |

| 3.4 | Damp Proof Course (DPC) | LmM | {{dpc_lmm}} | {{dpc_rate}} | {{dpc_amount}} |

| | **Total for Substructure** | | | | **{{substructure_total}}** |

Section 4.0: Superstructure

This section covers costs for works above the foundation, including walls, columns, beams, and slabs.

| Item | Description | Unit | Quantity | Unit Rate ({{currency_code}}) | Amount ({{currency_code}}) |

|------|-------------|------|----------|--------------------------|--------------------------|

| 4.1 | Concrete Columns | Cum | {{columns_cum}} | {{columns_rate}} | {{columns_amount}} |

| 4.2 | Concrete Beams | Cum | {{beams_cum}} | {{beams_rate}} | {{beams_amount}} |

| 4.3 | Concrete Slabs | SqM | {{slabs_sqm}} | {{slabs_rate}} | {{slabs_amount}} |

| 4.4 | Blockwork Walling (200mm thick) | SqM | {{walling_sqm}} | {{walling_rate}} | {{walling_amount}} |

| | **Total for Superstructure** | | | | **{{superstructure_total}}** |

Section 5.0: Finishes

This section details costs for internal and external finishes, including plastering, painting, flooring, and tiling.

| Item | Description | Unit | Quantity | Unit Rate ({{currency_code}}) | Amount ({{currency_code}}) |

|------|-------------|------|----------|--------------------------|--------------------------|

| 5.1 | Internal Wall Plaster | SqM | {{internal_plaster_sqm}} | {{internal_plaster_rate}} | {{internal_plaster_amount}} |

| 5.2 | External Wall Render | SqM | {{external_render_sqm}} | {{external_render_rate}} | {{external_render_amount}} |

| 5.3 | Emulsion Paint to Walls | SqM | {{paint_walls_sqm}} | {{paint_walls_rate}} | {{paint_walls_amount}} |

| 5.4 | Ceramic Floor Tiling | SqM | {{tiling_sqm}} | {{tiling_rate}} | {{tiling_amount}} |

| | **Total for Finishes** | | | | **{{finishes_total}}** |

Signature Block

Prepared by:

_____________________________

{{contractor_company_name}}

{{contractor_name}}

{{contractor_title}}

Date: {{signature_date}}

Accepted by:

_____________________________

{{client_company_name}}

{{client_name}}

{{client_title}}

Date: {{acceptance_date}}